Nolans Project EIS
Arafura commenced cultural heritage and baseline environmental studies at the Nolans site in 2006. The scope and intensity of these studies varied over time to reflect the availability of resources and development timeline. In February 2015 Arafura appointed GHD to coordinate the balance of the environmental studies and write the Nolans EIS, assisted by specialist consultants in the areas of social impact assessment, economic analysis, groundwater sustainability, radiation management and cultural heritage.
The draft EIS was lodged with the Northern Territory Environmental Protection Authority (NTEPA) in May 2016 and was subject to an eight-week public review period. More than 500 comments from 20 stakeholder groups were received during the public review; of these, 16 were Northern Territory and Australian Government agencies.
In December 2017 the NTEPA released its Assessment Report (including recommendations). Subsequent changes to the planned configuration of the Nolans Project required the completion of a Section 14A variation under the Northern Territory’s Environmental Assessment Administrative Procedures. This was submitted to the NTEPA in June and August 2019 and can be downloaded below. The NTEPA assessed the variation and in a Statement of Reasons document released in September 2019 determined that no further action was required.
The Australian Government’s Department of the Environment and Energy granted approval to Arafura in May 2018 subject to 14 conditions – the approval decision can be viewed here.
EIS Report
Greenhouse Gas Emissions Reduction Pathway
The Greenhouse Gas Emissions Reduction Pathway for the electrical power and steam requirements for the Nolans Project was released in January 2023. Click here to read the Greenhouse as Emissions Reduction Pathway in full.
Mine Management Plan Documents
To enquire about any of the information or links provided on this page please email arafura@arultd.com.
Performance Reporting
External performance reports, as required by permitting and legal obligations.